Selecting the right contract type is one of the most important early decisions in any construction project. The Canadian Construction Documents Committee (CCDC) has developed a suite of standard contract forms designed to suit different project sizes, risk profiles, timelines, and delivery methods. Below is a high-level overview of eight common CCDC contract types and when each is typically used.
1. Stipulated Price Contract (CCDC 2): This is the traditional design-bid-build contract and the most widely used format in Canada. The project is fully designed before tender, contractors bid on a fixed price, and the lowest compliant bid is usually awarded the work. The contractor assumes responsibility for construction and managing the trades, while the owner retains the design consultant separately. This format works best for straightforward projects with well-defined scopes and limited need for design innovation.
2. Master Agreement Between Owner and Contractor (CCDC 2MA): The CCDC 2MA is designed for owners who anticipate ongoing or repetitive work over several years. Instead of negotiating a new contract for each project, a master agreement establishes standard terms, with individual work orders issued as needed. This approach reduces procurement time and administrative effort, making it ideal for maintenance programs or recurring small-scale construction projects.
3. Cost-Plus Contract (CCDC 3): Under a cost-plus arrangement, the contractor is paid for actual costs plus a fee for overhead and profit. This format is often used when work must begin before designs are complete or when project complexity makes fixed pricing impractical. To protect the owner, cost-plus contracts are commonly paired with a guaranteed maximum price (GMP) and require detailed cost tracking and audit rights.
4. Unit Price Contract (CCDC 4): The unit price model is used when quantities are uncertain but unit costs can be reliably established. Contractors bid on rates per unit of work, and the final contract value depends on actual quantities performed. This format is common for civil, infrastructure, or maintenance work where volumes may vary. A maximum contract value is typically set to manage cost risk.
5. Construction Management Contract for Services (CCDC 5A): In this “owner-at-risk” model, the construction manager acts as an advisor and administrator, while the owner contracts directly with trade contractors. Construction can begin before the design is complete, with work released in phases. This approach allows early contractor input but requires the owner to assume greater contract management responsibility and risk.
6. Construction Management Contract for Services and Construction (CCDC 5B): The CCDC 5B shifts more risk to the construction manager, who not only provides advisory services but also contracts directly with the trades. Often referred to as “CM at risk,” this format reduces the owner’s administrative burden while still allowing phased construction and early design collaboration.
7. Design-Build Stipulated Price Contract (CCDC 14): Design-build combines design and construction under a single contract with one entity responsible for both. This can streamline communication and reduce disputes between designers and builders. It is best suited for owners with sufficient expertise to define performance requirements and oversee the design-builder’s work.
8. Integrated Project Delivery (CCDC 30): CCDC 30 is a collaborative, multi-party contract that brings the owner, designer, contractor, and key trades together from the outset. Risks and rewards are shared, and performance incentives are built into the agreement. While this model offers strong potential for innovation and cost control, it requires a high level of owner involvement and project governance.
Choosing the right CCDC contract type is a critical step in setting a construction project up for success. Understanding the differences between these contract models helps owners and contractors align expectations and select an approach that best fits the project’s complexity, schedule, and level of collaboration. With the right contract in place, project teams can focus less on managing disputes and more on delivering quality results.